Cartagena’s city government has identified nine stormwater channels it seeks to improve using proceeds from a 150 billion Colombian peso loan requested from the City Council. The prioritized sections total approximately 6,829 linear meters.
The financing is part of a borrowing request that remains under review. Identifying the channels does not mean that the loan has been contracted or that the works have been funded or completed.
Priority areas
The list includes La Magdalena and El Tigre in Olaya Herrera; Flor del Campo 1, Flor del Campo 2 and their shared channel; India 2 and India Final; El Paraguay; and the channel on Calle del Tablón in the historic center.
According to the administration, the interventions aim to improve drainage and reduce flood risks at different points across the city. Together, the nine sections cover approximately 6.8 kilometers.
Studies and funding request
The channels have detailed engineering studies and designs produced through an agreement with the Bolívar Urban Development Company, Edurbe. The work included topographical surveys, hydraulic modeling, reviews of utility networks, costs and maintenance recommendations.
The loan proposal also lists the Barú water supply system, a pipeline to the northern area and home improvements as priorities. The City Council discussed the initiative at a hearing on November 4; that meeting did not constitute approval of the loan.
During that discussion, Funcicar asked for the investments, their scope and costs to be formally specified, questioning whether the requested authorization would allow funding for any project in the Development Plan. The final allocation of funds depends on the relevant approval process.



